2013-06-12-5994.200-Rel Notes-DSSCO FTP Process (Freight Forwarder 'Speed' integration)-P #DotNetReleases2013
Release Notes
5994.200-Rel Notes-DSSCO FTP Process (Freight Forwarder 'Speed' integration).
Admin Info
Purpose
|
DSSCO FTP Process (Freight Forwarder 'Speed' integration).
|
Release No#
|
001
|
Submitted on
|
06/12/2013
|
Submitted by
|
Sandeep J
|
Source/Destination Systems
|
NEC PROD
|
Release Sent To
|
Babu Lankipalli
|
Objects Created By
|
Sandeep J
|
Objects Tested By
|
Sandeep J
|
Transport and Technical Objects
Location Objects Name
|
\\10.114.165.54\dev\DSSCODEV\Move to Prod\SPEED
- DSSCOPOFTPProcess
- DSSCOPOFTPProcess.exe
- FTPSpeed.bat
- SPEED_QRY.sql
|
Release Notes
For Infrastructure
Please take backup of existing pages in Production before replacing Prod pages.
Please run the below sql script against Production DB. Location of this script is specified in "
Location Objects Name" above
Test Notes
Speed:
Test Case ID
|
Test Case Name
|
Tested Environment
|
Steps
|
Expected Results
|
DSSCO_TC_FTP_001
|
Verify a PO having Speed data in OpenPO and Openpos_prev tables .
|
QA
|
1.Take a PO and verify the data in OPenPO and Openpos_prev tables.
|
PO Number data should be present in both OPenPO and Openpos_prev tables.
|
DSSCO_TC_FTP_002
|
Verify exfacdate falls between current date + 60 days in OpenPOs table.
|
QA
|
1. Change the exfacdate in openpos table for the selected PO.
2. Run the FTP job.
|
1.Exfacdate should be changed for selected PO in Openpos table.
2. PO file should be created for selected PO Number selected in Speed Folder.
|
Reference Document (Specifications or Production Support Break Fix)
2013-03-28-5994.200-Spec-DSSCO FTP Process (New Carrier 'Speed' integration).